Sea Frost DC 5000 사용자 설명서

다운로드
페이지 46
 
13
VALVE UNIT V/U 
 
For appearance and convenience of installation, the valve unit may be mounted outside 
the icebox. In certain applications and multiple plate systems it may be best to mount it 
inside.  Location of the V/U in multiple plate systems is indicated in the design layout 
from our application engineer. 
 
On an externally mounted V/U two 1/2" Swagelok fittings fasten the V/U to tubing 
protruding through the icebox wall.  Before cutting the tubing: 
 
•  Leave a minimum of 1 1/4" of tube beyond the bulkhead. 
•  Allow room for wrench access. 
 
On any installation: 
 
•  The Valve Unit may be mounted in any position.  
•  90-degree elbows can be factory installed on the Valve Unit to reduce the space 
requirements if necessary. 
•  The tubing will support the Valve Unit. 
•  The tubing must bottom in the fitting.  For final installation of this unit see the 
Swagelok text. 
•    The V/U will attract moisture. If it is mounted externally to the cabinet be sure it is 
accessible for proper insulation installation after the system has been leak 
checked and operationally tested. 
 
 
 
NOTES ON SWAGELOK FITTINGS 
 
 
Swagelok fittings come to you completely assembled, finger-tight. (Pieces a, b, and c in 
Drawing #1 are already together).  They are ready for immediate use. 
 
Disassembly before use can result in dirt and foreign material getting into the fitting and 
causing leaks.  If disassembly is necessary, reassemble per drawing. 
 
This is a double ferrule system.  The most serious installation problem encountered with 
SEA FROST is the incorrect assembly of these fittings.  Be absolutely sure that you 
assemble all fittings as in Drawing #1. 
 
To ease assembly slacken the fitting nut slightly before assembly. Then tighten with 
fingers before tightening with a wrench. (This is to avoid cross threading.) 
 
Step 1.  Always leave two inches of straight, undistorted tubing leading to all Swagelok 
fittings to allow proper connection.