Sanus Systems AFDV 사용자 설명서

다운로드
페이지 4
Step 5 - Add Top Shelf
Place the Top Shelf (
G) on the four 9” Pillars (A); then, using the four Top Bolts (F), secure the Top Shelf to the 9” Pillars.
Diagram 5
Step 6 - Install Wire Hole Bushings
Press a Wire Hole Bushing (
D) into each of the holes in the back of the Lower Shelves (H).
Diagram 6
Sanus Systems
  2221 Hwy 36 West, Saint Paul, MN 55113  1.18.06 (100004)
Customer Service: 800.359.5520. See complementary Sanus products at www.sanus.com
F
D
A
G
H