Multi Tech Equipment Multi Technology Equipment Indoor Furnishings MLT20DCA 사용자 설명서

다운로드
페이지 52
page 18 — MLT20 seRIes LIgHT TOWeR • OpeRaTIOn ManuaL — Rev. #0 (01/18/13) 
OperatiOn
sTaRTIng THe engIne
MasT OpeRaTIOn
Outriggers and support stands
See Figure 6 for location of components.
1.  Make sure both outriggers are extended. To extend the 
outriggers, pull the locking pin on the outrigger and hold 
while sliding out the outrigger assembly.
 NOTICE
Refer to the accompanying DCA20SPXU2 generator 
operation and parts manual (Part Number 49840) for 
information on how to start the engine.
  DangeR
aLWaYs make sure the area above 
light  tower  is  open  and  clear  of 
overhead  power  lines  and  other 
obstructions. The  tower  extends 
in  excess  of  30  feet  (9  meters). 
Contact with overhead power lines 
or other obstructions could result in 
equipment  damage,  serious  injury 
or death!
  DangeR
DO  nOT  stand  behind 
the  trailer  while  the 
mast  is  being  raised  or 
lowered.  Serious  injury 
could  result  if  the  mast 
falls down.
Figure 6. Deploying Outriggers
2.  As  soon  as  the  pin  clears  the  travel  position  hole, 
release it and continue sliding out the outrigger. The 
pin must snap into the outrigger locking hole in the 
extended position.
3.  After  extending  all  outriggers,  rotate  all  trailer  jack 
stands into the foot down position, then turn the crank 
handle on the jackstands clockwise to lower it and level 
the light tower.
4.  Check  behind  the  light  tower  and  make  sure  all 
personnel and objects are clear of the mast.
Deploying the Mast to vertical position
Refer to Figure 7 for the location of components:
1.  To release the mast from the mast cradle support, pull 
the retaining pin out of the cradle lock/release pin. Pull 
the cradle lock/release pin. This will unlock the mast 
from the horizontal position.
2.  Remove the mast lock/release pin before raising tower 
to the vertical position.
3.  To  place  the  mast  in  the  vertical  position,  turn  the 
vertical mast winch hand lever clockwise until the mast 
is pointing upwards at 90 degrees.
4.  Once the mast is in the vertical position, insert the 
mast lock/release pin to prevent the mast from falling.
PULL OUTRIGGER
TO EXTEND
PULL PIN TO
RELEASE
OUTRIGGER
ROTATE
JACKSTAND
TO PLACE
IN SUPPORT
POSITION
OUTRIGGER
JACKSTAND