Lenoxx Optima 3 FS 사용자 설명서

다운로드
페이지 54
ROUTINE MAINTENANCE 
* Inspect your stove or insert at minimum frequency stated until you establish a minimum frequency required for 
your installation (frequency will vary depending upon fuel BTU value / ash content, usage, and misc. installation 
variables). Unplug and Ensure Stove is Cold Before Performing Any Maintenance Work.  Include routine mainte-
nance with annual maintenance. The following areas need to be inspected and cleaned as part of annual main-
tenance:  
 
PAGE 28 
ROUTINE CLEANING 
 
Unplug and Ensure Stove is Cold Before Performing 
Any Maintenance Work. 
 
 
 
The following areas need to be inspected and cleaned 
during Routine Cleaning: 
•  UltraGrate (burn grate) 
•  Ash Pan 
•  Heat Exchange Tubes / Tube Scraper 
•  Photoeye 
•  Exhaust Passages and Vent Pipe 
•  Ash Clean-out Ports 
•  Gaskets 
•  Window Wash 
•  Rear Stove / Insert Compartment 
 
UltraGrate
 (Burn Grate for All Models) 
The UltraGrate
 should be inspected periodically to as-
sure that the air holes have not become clogged with ash 
or clinkers. The UltraGrate
 can easily be cleaned with 
the grate scraper / ash pan tool, or it can be removed for 
cleaning. It is very important to monitor the ash build up 
under the UltraGrate
, as excessive amounts of ash will 
block combustion air from entering the grate, causing 
pellets to pile-up in the grate. The grate cleaning proce-
dure is the same for all models. 
 
UltraGrate
 
 
 
 
* (Minimum Frequency of 1 day to 2 weeks) 
ASH PAN (Optima 2 FS and Optima 3 FS) 
 
All ash removal and cleaning should be done while 
stove is cold. 
 
The ash pan will have to be emptied periodically, depend-
ing on the amount of fuel consumed. To access follow 
steps one through four: 
1.  Open the glass door, then, using the ash pan / grate 
scraper tool, lift the UltraGrate® out and sweep the 
top ash into the pan below. 
2.  Remove the ash pan cover located below the door by 
pulling forward until magnets release. 
 
Models Optima 2 FS and Optima 3 FS 
 
 
Model Optima 3 INS 
 
 
 
 
 
Ash Pan 
Cover
 
UltraGrate
Ash Pan 
Cover
 
Optima 3 INS has a 
handle on the exterior 
of the ash pan cover for 
easy access and re-
moval. 
* (Recommended Frequency of 2 days – 2 
weeks)