Periodic maintenance  67 
Component to be inspected 
Task 
Frequency 
Capable Party 
Suppression system 
Suppression system test 
As required by 
local code 
Authorized technician 
— 
Fire-pull visual and operational 
inspection 
As required by 
local code 
Authorized technician 
— 
Fire strobe and horn visual and 
operational inspection 
As required by 
local code 
Authorized technician 
 
 
HP POD 40c NA structure 
 
Component to be inspected 
Task 
Frequency 
Capable Party 
Complete structure 
Visually inspect the structural 
integrity. 
Annually 
Qualified personnel 
— 
Inspect the door operation and 
inspect the door gaskets for water 
and air leaks. 
Annually 
Qualified personnel 
— 
Visually inspect the paint. Perform 
prep and touch-up as necessary. 
Annually 
Qualified personnel 
 
 
Life safety 
 
Component to be inspected 
Task 
Frequency 
Capable Party 
Manual EPO shunt trip 
EPO FUNCTIONAL TEST (POD will 
power down) 
Manually initiate EPO with the 
internal and external push buttons 
(if installed) in succession. (Verify 
all shunt-trips on all panels trip.) 
Annually 
Qualified personnel 
Thermal EPO shunt trip 
EPO FUNCTIONAL TEST (POD will 
power down) 
Initiate a thermal (automatic) EPO 
shutdown via the EPO 
temperature switches located in 
the hot aisle. (Verify all shunt-trips 
on all panels trip.) 
Annually 
Qualified personnel