Bil-Jax Utility Trailer ET 5000W 사용자 설명서
EQUIPMENT LOADING
6
Lower the Deck
NOTE: Trailer must be hitched to vehicle according to page 5 before lowering or raising the deck.
1. Turn power switch to ON position.
2. Hold toggle switch in DOWN position. Lift
latch handle and push handle back.
NOTE: The trailer frame should be on a level
surface when lowering the deck.
surface when lowering the deck.
Load the Equipment
1. Load equipment so that the resulting tongue
weight is 15 to 20% of the total load.
2. Install tie-down straps to keep the load from
shifting. Use 7 tie-down anchors shown.
2 5
/ 1
6”
BA
LL
2 5/
16
” BA
LL
Maximum capacity = 5000 lbs. Do not exceed.
Always secure the load with tie-down straps
before towing. Failure to properly secure the
load may result in injury, death, or equipment
damage.
before towing. Failure to properly secure the
load may result in injury, death, or equipment
damage.
Do not hook tie-down straps on the roller
guides.
guides.