Utica Boilers SSC 설치 설명서

다운로드
페이지 4
 P/N 240008957, Rev. B [04/2013]
Converting Boiler From Natural Gas To LP:
1. 
Follow instructions To TURN OFF GAS TO APPLIANCE 
found on Operating Instructions label on boiler or in 
Installation, Operation & Maintenance Manual. Verify all 
electrical power to boiler is turned off.
 WARNING
Electrical shock hazard. Turn OFF electrical power 
supply at service panel.
!
  
2. 
Remove upper jacket from boiler.
3. 
Follow instruction TO TURN OFF GAS TO APPLIANCE. 
Verify electrical power is OFF.
4. 
Remove screws as shown in fi gures 1 & 2. Carefully 
separate gas valve.
5. 
Insert LP orifi ce as shown in fi gures 1 & 2.  See Table 1 
for orifi ce size.
6. 
050 Mbh thru 200, O-ring gasket shown in fi gure 1 must 
remain in place.
7. 
Connect gas valve using previously removed screws.  
8. 
Place "Natural to LP" and "Converted by" labels onto 
boiler as shown in fi gures 4 & 5.
9. 
Replace upper jacket.
10. 
Follow instructions in “Start-up Procedure” section of 
boiler's Installation, Operation & Maintenance Manual for 
proper startup and verifi cation procedures.
Figure - 1  Disconnect Venturi Body from Gas Valve 
050/075/100/150/200
TORX OR 
ALLEN SCREW 
HEAD 3 REQ'D.
VENTURI
BRASS LP ORIFICE
O-RING GASKET
GAS VALVE
CONVERSION KIT INSTRUCTIONS
NATURAL GAS TO LP & LP TO NATURAL GAS 
 050  Kit #550002303,  
 075  Kit #550002304, 
 100  Kit #550002305,    
 150  Kit #550002306, 
200  Kit #550002307
299  Kit #550002799
 WARNING
Fire, explosion, asphyxiation and electrical shock 
hazard.  Improper installation could result in death or 
serious injury. Read this instruction and understand 
all requirements, including requirements of authority 
having jurisdiction, before beginning installation.  
Installation not complete until appliance operation 
verifi ed per Installation, Operation & Maintenance 
Manual provided with boiler.
!
  
Kit installation shall be completed by qualifi ed agency.