Zephyr AK8400AS 사용 및 관리
10
www.zephyronline.com
Installation –
Installing the Power Pack
1. Install optional AK084xAS Stainless Steel Liner. Review
manual included with liner for more details.
2. If no liner is used cut out an opening in the bottom of the
cabinet by following the dimensions in FIG 1.
5HPRYHDOXPLQXPPHVK¿OWHU
4. Lift Power Pack into opening and ensure locking clip has
ORFNHGLQWRSRVLWLRQORFNLQJFOLSLVORFDWHGRQOHIWVLGHRI
Power Pack. FIG 2
Power Pack. FIG 2
)DVWHQ0VFUHZVLQWRWKHUHDUORQJVLGHRI3RZHU
Pack. If a liner is used the screws will go through the
Power Pack mounting holes, then the liner and into the
wood base. note: Wood blocking may need to be added
to cabinet base if additional support is needed. see FIG 3
and FIG 4
Power Pack mounting holes, then the liner and into the
wood base. note: Wood blocking may need to be added
to cabinet base if additional support is needed. see FIG 3
and FIG 4
6. Remove 4 screws from Power Pack face plate. The face
plate will drop down and hang by internal chains. Access to
IURQWORQJVLGHRI3RZHU3DFNLVQRZDYDLODEOH)DVWHQ
M4 screws into the front long side of Power Pack.
M4 screws into the front long side of Power Pack.
5HLQVWDOO3RZHU3DFNIDFHSODWHE\SUHYLRXVO\
removed screws.
8. Install duct work and seal with duct tape.
9. Install electrical.
10. Remove all packing materials before using Power
Pack. Switch power on and check for leaks around duct
tape.
tape.
,QVWDOODOXPLQXPPHVK¿OWHU
CAUTION: At least two installers are
required due to the weight and size of the
hood.
hood.
!
Ductwork
wood base
wood base
2” minimum
2” minimum
secure (2) M4 screws to mounting
holes on each long side of Power Pack
holes on each long side of Power Pack
metal or other non
combustible material
combustible material
Ductwork
wood base
wood base
2” minimum
2” minimum
FIG 1
FIG 2
FIG 3
FIG 4
locking clip
mounting holes
front view
right side view
Ductwork
cabinet bottom cut-out size
19
3/4
”
10
1/4
”
Power Pack
Stainless Steel Liner
C/L
C/L