Viking VBCI5150GXSS 설치 설명서
![Viking](https://files.manualsbrain.com/attachments/e06dbcb7c3f6b371afe2ae78c5a2c3d087abbdf4/common/fit/150/50/806d33188597c2a9e5700d284ff8fd5a13006393d8732de3f703fc413425/brand_logo.png)
16
Installation Checklist
IMPORTANT: To ensure a safe and proper installation, review below items directly with installer.
□ Has all shipping tape, string and packing been removed?
□ Has the unit been secured in place with the provided anti-tip bracket or is the unit 1 inch or
less from a solid soffit?
□ Are all levelers extended down to make contact with the floor?
□ Is the unit level?
□ Is the power cord connected directly into a properly grounded 3-prong outlet in accordance
with all applicable local codes?
□ Has all stainless protection film been removed?
□ Are the panel(s) (wood overlays, if used) attached securely and properly?
□ Allow the unit to operate for at least 24 hours before loading products or adjusting
temperature settings.