Zephyr ZVNM90AG 사용자 매뉴얼

다운로드
페이지 48
11
Installation – 
Mounting the Hood
7.  Remove tape securing electronics mounting bracket to hood. (FIG. F, #1) Position electronics mounting bracket 
as show in (FIG. F, #2) and secure to hood body using (3) M4 x 8 truss head sheet metal screws.
8.  Lift hood body and align the (4) pre-installed mounting screws on top of blower housing (FIG. A, #5 on Page 9) with 
the (4) key holes on the bottom of the support frame. (FIG. H)  Slide hood towards the narrow end of key holes to lock 
in place.  Hand tighten each of the (4) screws to secure hood to bottom of support frame. Install (1) M4 x 12mm safety 
screw into bottom support frame to further secure the hood. (FIG. H, #1) 
9.  Install electrical and duct work. Seal duct work with aluminum duct tape.
10. Power up hood, verify all functions and check for leaks around duct tape.
FIG. F
ELECTRONICS 
MOUNTING 
BRACKET
1
2
FIG. H
1
CAUTION: At least two installers are
required due to the weight and size of the
hood.
!