Zephyr CPAE54ASX 매뉴얼

다운로드
페이지 27
20
Inst
allation - Electrical Connection & Final Inst
allation S
tep
s
18. Electrical connection
WARNING
Electrical Shock Hazard
Warning: Turn off power circuit at the service panel
before wiring this unit.
120 VAC, 15 or 20 Amp circuit required.
ELECTRICAL GROUNDING INSTRUCTIONS
THIS APPLIANCE IS FITTED WITH AN ELECTRICAL
JUNCTION BOX WITH 3 WIRES, ONE OF WHICH
(GREEN/YELLOW) SERVES TO GROUND THE
APPLIANCE. TO PROTECT YOU AGAINST
ELECTRIC SHOCK, THE GREEN AND YELLOW
WIRE MUST BE CONNECTED TO THE GROUNDING
WIRE IN YOUR
HOME ELECTRICAL SYSTEM, AND IT MUST UNDER
NO CIRCUMSTANCES BE CUT OR REMOVED.
Failure to do so can result in death or electrical
shock.
Install the conduit connector (cULus  listed) in
junction box.
Run 3 wires; black, white and green, according to the
National Electrical Code  and local codes and
ordinances, in 1/2" conduit from service panel to
junction box.
J-Box cover
Conduit
Connect black wire from service panel to black or red
in junction box, white to white and green to green-
yellow.
Close and secure junction box cover.
19. Note: disregard this step if the hood has been fitted
with an internal blower.
Purchase and install an External blower (See
paragraph „Before installing the hood - Parts not
supplied“ for model reference).
20. Check all light bulbs to make sure they are secure
in their sockets.
21. Install the internal left-right side covers (See
chapter "Installation-preliminary operations")
22. Install filters.
23. Install the lower section of the Duct Cover (Starting
Collar) with 2 screws and slide it towards the top of
the hood.
Turn power (On) in service panel.
Check lights and blower operation.
If range hood does not operate:
Check that the circuit breaker is not tripped or the
house fuse blown.
Disconnect power supply. Check that wiring is
correct.