Prestige RB1600 매뉴얼
FLAT ROOF BLOWER INSTALLATION INSTRUCTIONS
Determine the shortest route for the duct to exit through the flat roof. Have a qualified roofer build a
square curb on the flat roof. Normal height for the curb should be approximately 8” so that no water
can run over the curb. Have the roofer flash and waterproof the curb into the flat roof housing. The
horizontal dimension of the curb after the flashing work should be 1/2” smaller than the bottom frame
of the blower housing. After the curb is built, cut a circle into the roof deck, 1/2” larger than the diam-
eter of the duct to be used. Drill a 1/2” hole for the electrical conduit. Have a licensed electrician pull
the electrical wires from the hood through the hole in the roof deck. Remove the weatherproof cover
and bring the wires into the electrical junction box. Connect the BLACK wire to BLACK wire on the
blower, WHITE to BLUE on blower. Connect duct work to the starter collar of the blower and bolt the
fan onto the curb. Check that impeller is turning freely, close weatherproof cover of the flat roof fan.
Switch on power and check blower.
- 2 -
Neutral (White)
Live (Black)
Black must go
to 120-volt AC
Source.
Blue (Neutral)
Black (Live)
Diagram A