Kobe Range Hoods CH7936SQ 사용자 설명서

다운로드
페이지 33
 
 
 
1.  Puncture the knockout holes on the hood as shown in Figure 4. 
2.  Unscrew the six screws on the bottom casing.  Remove the bottom casing.  If necessary, 
arrange the electrical wires to run through the 1” diameter hole on the hood.  Refer to 
Figure 5. 
3.  Using references on Table 1 and measurements on page 21, center the hood in place 
beneath the cabinet and flush with the front of the cabinet. 
 
 
                     
                                                                                                                  
1” Diameter                   
                                                                                                                                     Hole 
 
 
 
 
 
 
                                           Figure 4                                                           Figure 5                                                
           
4.  Draw electrical wires through cabinet access opening. 
5.  Place screw (not provided) into the exact center of each knockout hole.  Make sure all 
screws are in place before tightening screws.  CAUTION: MAKE SURE THE HOOD IS 
SECURE BEFORE RELEASING. 
 
Ductwork Installation 
 
6.  Use aluminum or steel pipe to connect the plastic exhaust on the hood to the ductwork 
above.  Use duct tape to make all joints secure and air tight.   
7.  Continued on page 16.