Kobe Range Hoods CH0136SQB 사용자 설명서

다운로드
페이지 36
 
11 
Duct Cover Installation 
 
5.  Use  8”  aluminum  or  steel  pipe  (follow  building 
codes  in  your  area)  to  connect  the  ducting 
transition  on  the  hood  to  the  ductwork  above.  
Use duct tape to seal and secure joints as shown 
in Figure 15.  Slide the duct cover onto the hood.  
 
6.  Use 3/16” x 3/8”  screws  (provided)  to attach duct 
cover to hood. 
 
 
 
 
 
 
 
 
 
 
 
 
                            Figure 15 
 
Final Assembly 
CAUTION
:  Install heating lamps last. 
 
7.  Drop Oil Tunnel into support structure.  Refer to 
Figure 7. 
 
8.  Angle baffle filter toward back of hood 
.  Refer 
to Figure 8. 
 
9.  Push baffle filter up until almost level 
 
10.  Slide forward into recess at front of hood 
.
 
 
11.  Lower baffle filter 
 
and slide back until it fits into 
resting position 
.
 
 
12.  Repeat for all baffle filters and spacers. Refer to 
Measurements and Diagrams on page 21 for 
baffle filter and stainless spacer arrangement. 
 
13.  Install heating lamps (not provided), 120 Volts 
250 Watts max. each. 
 
14.  Turn power ON in control panel. Check all 
lights and fan operation. 
 
15.  Make sure to leave this manual for the 
homeowner. 
 
 
           
 
 
                           Figure 16 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                         Figure 17