Netgear JGS524NA 전단

다운로드
페이지 2
Installation Guide
ProSafe® 16-port or 24-port Gigabit Switch JGS516 V2 or 
JGS524 V2
Package Contents
Verify that all items are in the box. The package includes:
•     
ProSafe® 16-port or 24-port Gigabit Switch JGS516 V2 or JGS524 V2
•     
Power cord with localized plug
•     
Adhesive feet
•     
Rack-mount brackets and hardware
•     
Installation Guide (this document)
Front View
24 Gigabit ports for the JGS524,
LEDs
 or 16 for the JGS516
The switch supports 10 Mbps, 100 Mbps, and 1000 Mbps connections. Using 
Gigabit Ethernet (1000 Mbps), the switch sends files across the network at speeds 
up of to 2000 Mbps due to the full duplex nature of Gigabit Ethernet connections. 
The switch supports straight-through or crossover Ethernet cables. Each port on the 
switch configures itself based on the cable that you plug into it. Depending on the 
model, you can use the switch to connect either up to 24 or 16 Ethernet devices 
such as computers, file servers, printers, routers, switches, or hubs.
Installation
Estimated time: 5–10 Minutes
Select a Location
Decide where you want to place the switch. Find a flat horizontal surface or a  
19-inch rack.
Make sure that the location is:
•     
Not in direct sunlight or near a heater or heating vent.
•     
Not cluttered or crowded. There should be at least 2 inches (5 cm) of clear 
space on all sides of the switch.
•     
Well ventilated, especially if it is in a closet.
Install the Switch
1.   
For each device that you want to connect to the switch, provide an enhanced 
Category 5 (Cat 5e) Ethernet cable with RJ-45 connections. Each Ethernet 
cable has to be less than 328 feet (100 meters) long.
2.   
Install the switch on a flat surface or in a standard 19-inch rack.
•    
Flat surface. The switch comes with four self-adhesive footpads. Stick one 
footpad on each of the four concave spaces on the bottom of the switch. The 
footpads cushion the switch against shock and vibrations. 
•    
Rack mounting. Follow the instructions in the 19-Inch Rack Mounting 
section.
Verify Cable Connections
Before you apply power, perform the following checks:
1.   
Inspect the equipment thoroughly.
2.   
Verify that all cables are installed correctly.
3.   
Check cable routing to ensure that cables are not damaged and will not create 
a safety hazard.
4.   
Be sure that all equipment is mounted securely.
19-Inch Rack Mounting
Use the rack-mount kit supplied with 
your switch. 
1.   
Use the Phillips head screws to 
fasten the mounting brackets to 
the sides of the switch. Tighten 
the screws with a No. 1 Phillips 
screwdriver. 
2.   
Align the bracket and rack holes. 
Use two pan-head screws with 
nylon washers to fasten each 
bracket to the rack. Tighten the 
screws with a No. 2 Phillips 
screwdriver to secure the switch 
in the rack. 
Troubleshooting
You can use the LEDs to troubleshoot hardware problems.
Power LED Is Off
The switch has no power.
•     
Make sure that the power cord is securely connected to the switch.
•     
Make sure that the power cord is connected to a functioning power outlet. If it is 
connected to a power strip, make sure that the power strip is turned on. If the 
socket is controlled by a light switch, make sure the switch is in the on position.
Port LED Is Off for a Connected Device or Stays On Continuously
There is a hardware connection problem.
•     
Make sure that the cable connectors are securely plugged in to the switch and 
the device.
•     
Make sure that the connected device is turned on.
•     
If the Ethernet cable is connected to a network interface card or other Ethernet 
adapter, make sure that the card or adapter is installed correctly and is working.
•     
Make sure the cable is less than 328 feet (100 meters) long.
JGS516_JGS524_IG.fm  Page 1  Tuesday, January 3, 2012  4:42 PM