Introduction
Eaton’s Powerware
®
Energy Management System (EMS) Upgrade Kit
(EMS−UGK) is designed to monitor energy usage of existing power
distribution panelboards, remote power panels, or power distribution
units. Providing outstanding performance and reliability, the EMS−UGK’s
unique benefits include the following:
distribution panelboards, remote power panels, or power distribution
units. Providing outstanding performance and reliability, the EMS−UGK’s
unique benefits include the following:
S
Monitors up to 42 (single panel) or 84 (dual panel) circuits in a
standard three−phase panelboard. Measures and stores energy
parameters for each of the individual monitored circuits, letting you
manage power with greater precision.
standard three−phase panelboard. Measures and stores energy
parameters for each of the individual monitored circuits, letting you
manage power with greater precision.
S
Functions in a wide variety of applications supporting various data
center loads that may require a power distribution monitoring
solution, especially where power needs are changing and backup
architecture must be scalable.
center loads that may require a power distribution monitoring
solution, especially where power needs are changing and backup
architecture must be scalable.
S
Can be mounted on a wall with the included mounting bracket and
customer−supplied fasteners appropriate for the type of wall.
customer−supplied fasteners appropriate for the type of wall.
S
Choice of voltage sensing installation: connection to an unoccupied
circuit breaker using included transition harnesses or connection to an
occupied circuit breaker using included wire taps.
circuit breaker using included transition harnesses or connection to an
occupied circuit breaker using included wire taps.
S
Includes a software tool for easy configuring of settings and options.
S
All harnesses supplied except for optional external ground.
S
No preventive maintenance required other than verifying the
hardware and wiring are clear of debris. The EMS−UGK does not
require an annual calibration.
hardware and wiring are clear of debris. The EMS−UGK does not
require an annual calibration.
S
Advanced Metering monitoring system, providing communication
options such as network connectivity through the Power Xpert
options such as network connectivity through the Power Xpert
®
Gateway Card installed in the X−Slot
®
communication bay.
S
Intended for continuous duty operation.
S
Backed by worldwide agency approvals.