Motorola PTP 500 사용자 설명서

다운로드
페이지 20
 
Attach free end (large 
tag M10) to Tower Metal 
work – NB On no ac-
count must this be at-
tached to the mount-
ing bracket bolts!! 
 
 
Step 1: Your equipment will already have the 
mounting bracket fitted.  
 
 
 
 
 
Do not
  remove pre-fitted mounting 
bracket.
  
 
The pre-fitted earth bonding lead is secured 
after the unit is mounted. 
 
 
 
Step 2:  Attach the Bracket mount to the pole 
using the bracket strap and either            M8 
x 40mm or M8 x 70mm bolts, as required, M8 
flat washers and M8 coil washers  as shown. 
Tighten to ensure the  assembly grips but 
can be adjusted. For poles between 
1” (26mm) and 2”(50mm) reverse the 
bracket. 
 
 
 
 
Step 3:   Offer up the unit to the bracket 
mount and affix using the captive M8 bolt. 
Tighten to ensure the assembly grips but can 
be adjusted on the pole. 
 
 
 
Step 4:   Adjust the elevation and azimuth of 
the unit before tightening  to the required 
torque settings of 14Nm 
(11lbft) for both bolts.  
 
 
          
Warning ! Do not over tighten.
 
Earth bonding 
lead 
Mast Installation Instructions