Framing and Finishing
1) 
Determine the total thickness of facing material (e.g. drywall plus 
ceramic tiles) to allow the fi nished surface to be fl ush with the front 
of the unit. Total facing thickness can vary from 1/2” (13mm) to 
1-1/4” (32mm) thick.  
2) 
Frame in the enclosure for the unit with framing material. 
 
Note: Header for the P36 must be installed vertically to maintain 
clearances to combustible materials.  Non combustible header may 
be installed horizontally.  
3) 
For exterior walls, insulate the enclosure to the same degree as 
the rest of the house, apply vapor barrier and drywall, as per local 
installation codes. (Do not insulate the fi replace itself.)
4) 
The top of the unit must not be closer than 32” (813mm) to the 
ceiling.
5) 
Combustible material may be brought up to the top and sides of 
the unit and be covered with ceramic tiles, bricks, rock or other 
suitable combustible fi nishing materials.
 
If using the Barcelona Surround, Kensington, Balmoral, or 
Tripoli Screen Door please note that framing and facing must 
be non combustible (12” on top and 6” on both sides) and  that 
the Barcelona is only approved  for installation with a single 
sidewall.
 
Note: The unit does not have to be completely enclosed in a 
chase. The clearance on top of the unit is 0” to the standoffs 
so combustible building materials can be laid directly on top 
of the standoffs. You must maintain proper clearances from 
the vent to combustible materials (See Below).
6) 
Use metal studs for framing where the minimum clearance from 
the vent to combustible material cannot be maintained.
Drywall
Mantel Clearances
2
0
12
6
4
8
10
0
Side View
Top of
Unit
12" (305mm)
3-1/2" (89mm)
7-1/2"(191mm)
A
To base
of Unit
Standof
f
B
C
D
6" Side Wall
5"
2"
Mantel
leg
Mantel
leg
P36 - P36D
Allowable mantel leg
projection.
3"
1-1/2"
8" Single Sidewall when using the Barcelona Surrround
Mantel Clearances
A
B
C
D
with Flush Glass or 
Hampton Cast
30-1/2” 
(778mm)
14” (356mm)
10” (254mm)
7” (178mm)
with Bay Option
30-1/2” 
(778mm)
13” (330mm)
10” (254mm)
7” (178mm)
with Flush Glass and 
Barcelona Surround
30-1/2” 
(778mm)
17” (432mm)
12” (305mm)
8” (203mm)
with Tripoli Screen Door, 
Kensington, or Balmoral 
Front
30-1/2” 
(778mm)
20” (508mm)
N/A
12” (305mm)
P36 - P36D Gas Fireplace
Combustible Mantels
Because of the extreme heat this fi replace emits, the mantel 
clearances are critical.
 Combustible mantel clearances from top of 
the louvers are shown in the diagram below. Mantel may be installed 
anywhere in the shaded area or higher.
Note:  If desired a non-combustible mantel may be installed at a 
lower height.
Note:  Ensure the paint that is used on the mantel and the facing 
is “heat resistant” or the paint may discolour.
Mantel Leg Clearances
Combustible mantel leg clearances as per diagram below:
Clearances are from the fi nished edge of the unit or an installed front. 
Maximum 
1-1/2” projection at 2” 
minimum clearance.
WARNING
Failure to maintain required clearances is a major cause of 
chimney related fi res.  Installation of this fi replace must comply 
with these clearances.
Clearance:
Dimension
Measured From:
A: Mantel Height
7” (178mm)
Minimum (Additional on this page)
B: Sidewall
6” (152mm)
Side of installed front
Sidewall: Barcelona Only
8” (203mm)
Approved for single sidewall only
C: Ceiling
32” (813mm)
Top of installed unit
D: Mantel Depth
12” (305mm)
Maximum (Additional on this page)
E: Alcove Width
48” (1219mm)
Sidewall to Sidewall (Minimum)
F: Alcove Depth
36” (914mm)
Front to back wall (Maximum)
Top of Hearth must not be higher than the base of the fi rebox. 
Vent Clearances
Clearance Dimension
Horizontal - Top
2” (51mm)
Horizontal - Side
1-1/2” (38mm)
Horizontal - Bottom
1-1/2” (38mm)
Vertical (Flex or Rigid)
1-1/4” (32mm)
E
B
B
A
C
D
F
Clearance Requirements