Regency U32S-LP5 사용자 설명서

다운로드
페이지 36
10
U32S-5 FPI Direct Vent Gas Insert
GAS PIPE 
PRESSURE TESTING
The appliance must be isolated from the gas 
supply piping system by closing its individual 
manual shut-off valve during any pressure 
testing of the gas supply piping system at test 
pressures equal to or less than 1/2 psig. (3.45 
kPa).  Disconnect piping from valve at pressures 
over 1/2 psig.
The manifold pressure is controlled by a 
regulator built into the gas control, and should 
be checked at the pressure test point.
Note: To properly check gas pressure, both 
inlet and manifold pressures should 
be checked using the valve pressure 
ports on the valve.
1)  Make sure the valve is in the "OFF" 
position.
2)  Loosen the "IN" and/or "OUT" pressure 
tap(s), turning counterclockwise with a 1/8" 
wide fl at screwdriver.
3)  Attach manometer to "IN" and/or "OUT" 
pressure tap(s) using a 5/16" ID hose.
4)  Light the pilot and turn the valve to "ON" 
position.
INSTALLATION 
5)  The pressure check should be carried out 
with the unit burning and the setting should 
be within the limits specifi ed on the safety 
label.
6) When fi nished reading manometer, turn 
off the gas valve, disconnect the hose and 
tighten the screw (clockwise) with a 1/8" 
fl at screwdriver. Note: Screw should be 
snug, but do not over tighten.
GAS INSERT 
AERATION SYSTEM
The burner aeration is factory set but may need 
adjusting due to either the local gas suppply or 
altitude.  Open the air shutter for a blue fl ame 
or close for a yellow fl ame.
The burner assembly will need to be removed 
in order to adjust burner aeration if required.  
See steps 1-4 in 'Conversion from NG to LP.
 
 
Minimum Air shutter Opening
Glass 
Crystals
Ceramic
Stones
Natural Gas
3/8"
1/8"
Propane
1/2"
3/8"
CAUTION: Carbon will be produced if air 
shutter is closed too much. 
Note: Any damage due to carboning 
resulting from setting the aeration 
controls  improperly is NOT covered under 
warranty.
Note:  Aeration Adjustment should only 
be performed by an authorized FPI 
Installer at the time of installation 
or service.
Be careful not to damage thermal insula-
tion when sliding on vent connector plate. 
This could cause blockage.
FLUE LINER 
INSTALLATION
1) Cut the fl ex liner as required.
 
2)  Mark the end of one liner to indicate 
Inlet.
3)  Connect the other end of the above liner to 
the inlet side of the termination adaptor, seal 
connection with high temperature silicone. 
Secure with gear clamp.
4)  Connect the 2nd liner to the exhaust side 
of the adaptor, seal connection with high 
temperature silicone. Secure with gear 
clamp.
5) Install fl ashing.
6)  Insert both liners into chimney, passing 
through the damper opening.
7)  Install termination cap.
8) Connect the marked end of the liner to 
the inlet  collar of the vent connector plate 
marked with an "I", seal connection with 
high temperature silicone. Secure with gear 
clamp.
9)  Connect the 2nd liner to the exhaust collar 
marked with an "E", seal connection with 
high temperature silicone. Secure with gear 
clamp.
NOTES:  
1)  Final gas connection should be made after 
unit is in place to avoid damage to line when 
pushing the unit into position.
2)  Mill-pac may be used instead of high 
temperature silicone and screws may be 
used instead of gear clamps at connections 
of liner to inlet and vent collars.