Roberts Gorden UHD[X][S][R] 125 사용자 설명서

다운로드
페이지 54
 UHD L
OW
 P
ROFILE
 D
UCT
 F
URNACE
 I
NSTALLATION
 O
PERATION
 
AND
 S
ERVICE
 M
ANUAL
38 
14.5 Flue Blower Vertical Installation
IT IS IMPORTANT THAT ONLY THE CORRECT FLUE BLOWER SPECIFIED FOR EACH MODEL TYPE 
IS USED WHEN REPLACING THESE ITEMS.
Carry out a start-up after working on or changing a flue blower. See Page 26, Section 11.
MODEL
UHD[X][S][R] 75
UHD[X][S][R] 100
UHD[X][S][R] 125
 Flue Blower P/N
90710404
90710405
90710405
Mounting Plate
to Vent Box
fixing screws
Flexible Air 
Duct
Intake & 
Exhaust 
Covers
Air Intake Adapter
Gasket
Air Intake
Adaptor
Intake & 
Exhaust 
Covers
Mounting Plate
to Vent Box
fixing screws
Gaskets
Vent Box
Mounting Plate
to Flue Blower
screws
To remove the blower, remove 
screws securing the fan and 
mounting plate to the vent box. 
To remove the blower from the 
mounting plate, remove screws.
Refit in reverse order.
To change the vent and air 
intake orientation from back to 
top, remove the blower and 
mounting plate as above.
Remove intake (if applicable) 
and exhaust covers from top of 
the heater.
Rotate the blower, mounting 
plate and gasket clockwise until 
the flue adapter lines up with 
the top hole. Secure screws.
If applicable, remove the flexible 
air duct from the air intake 
adapter on the back.
If applicable, remove the air 
intake adapter from the back of 
the heater and install in the 
appropriate hole on top. 
Reconnect the flexible air duct.
Install intake and exhaust 
covers over the back holes.
NOTE: Separated combustion model shown.