Avaya 555-233-116 사용자 설명서

다운로드
페이지 246
Stratum 3 clock
555-233-116
170
Issue 4   October 2002 
7. Bridge the jumper wires to cross-connect from the TN780 in A and B 
carriers to the Stratum 3 clock.
8. Dress the cables down sides of the cabinet and run through the cable 
Slack Manager, if provided.
9. Administer the switch for the clock.
CCB01R
 BK-BL/21
 EXTSYN1T
 Y-G/35
CCB01T
 BL-BK/22
EXTSYN1R
 G-Y/37
CCA02R
 BK-O/23
EXTSYN0T
 V-BL/41
CCA02T
 O-BK/24
EXTSYN0R
 BL-V/42
CCB02R
 BK-G/25
EXTSYN1T
 Y-G/35
CCB02T
 G-BK/26
EXTSYN1R
 G-Y/37
Table 23.
Circuit-pack cross-connects for high or critical reliability  — Continued  
From Stratum 3 Clock
To TN780 carrier A
To TN780 carrier B
Lead
Name 
Lead Color/
Terminal
Lead
Name 
Lead Color/
Terminal
Lead
Name 
Lead Color/
Terminal
Continued on next page