Avaya 555-233-116 사용자 설명서
Stratum 3 clock
555-233-116
170
Issue 4 October 2002
7. Bridge the jumper wires to cross-connect from the TN780 in A and B
carriers to the Stratum 3 clock.
8. Dress the cables down sides of the cabinet and run through the cable
Slack Manager, if provided.
9. Administer the switch for the clock.
CCB01R
BK-BL/21
EXTSYN1T
Y-G/35
CCB01T
BL-BK/22
EXTSYN1R
G-Y/37
CCA02R
BK-O/23
EXTSYN0T
V-BL/41
CCA02T
O-BK/24
EXTSYN0R
BL-V/42
CCB02R
BK-G/25
EXTSYN1T
Y-G/35
CCB02T
G-BK/26
EXTSYN1R
G-Y/37
Table 23.
Circuit-pack cross-connects for high or critical reliability — Continued
From Stratum 3 Clock
To TN780 carrier A
To TN780 carrier B
Lead
Name
Name
Lead Color/
Terminal
Terminal
Lead
Name
Name
Lead Color/
Terminal
Terminal
Lead
Name
Name
Lead Color/
Terminal
Terminal
Continued on next page