Psion Teklogix 7525 사용자 설명서
Psion Teklogix WORKABOUT PRO With Windows Mobile 2003 SE User Manual
199
Chapter 7: Programs
Changing Synchronization Settings
7.8.3 Changing Synchronization Settings
•
In ActiveSync on your PC, double-tap the Inbox item in the Sync Options tab.
Figure 7.23 Mail Synchronization PC Screen
•
Add a checkmark next to the folders in this screen that you want to synchro-
nize with your WORKABOUT PRO.
nize with your WORKABOUT PRO.
•
To control the number of lines copied to the WORKABOUT PRO, put a
check mark next to To save space, copy at most and specify the maximum
number of lines of text.
check mark next to To save space, copy at most and specify the maximum
number of lines of text.
•
To indicate how far back you want the WORKABOUT PRO to synchronize
e-mail, put a check mark next to Copy messages from the last and type the
number of days.
e-mail, put a check mark next to Copy messages from the last and type the
number of days.
•
If you want to accept file attachments, add a check mark next to Include file
attachments. To limit the size, tap on Limit attachment size, and specify a
size in the KB box.
attachments. To limit the size, tap on Limit attachment size, and specify a
size in the KB box.
•
Tap on OK.