사용자 설명서차례SECTION 1: Heater Safety11.1 Manpower Requirements11.2 Safety Labels and Their Placement11.3 California Proposition 651Figure 1: Top and Bottom Panel Label Placement2Figure 2: Side and Back Panel Label Placement3SECTION 2: Installer Responsibility42.1 Wall Tag42.2 Corrosive Chemicals42.3 National Standards and Applicable Codes4SECTION 3: Clearances to Combustibles53.1 Required Clearances to Combustibles5Figure 3: Standard Reflector5Figure 4: One Side Reflector6Figure 5: Two Side Reflectors6Figure 6: 45° Tilt Reflector6Figure 7: U-Tube, Standard Reflector7Figure 8: U-Tube, 45°7Figure 9: U-Tube, Opposite 45° Reflector7Figure 10: 2-Foot Deco Grille and Protective Grille8Figure 11: Lower Clearance Shield8Figure 12: Venting8SECTION 4: National Standards and Applicable Codes94.1 Gas Codes94.2 Aircraft Hangars94.3 Public Garages94.4 Electrical94.5 Venting94.6 High Altitude9SECTION 5: Major Components10Figure 13: Major Component Descriptions105.1 Standard Parts List11Table 1: Contents of Burner Carton11Table 2: Contents of Core and Extension Packages11Table 3: CTH3-Series Component Package Guide11SECTION 6: Heater Installation12Figure 14: Critical Hanger Placement13Figure 15: Linear Heater Assembly Overview14Figure 16: Linear Heater Layout Overview156.1 Burner Tube Installation166.2 Tube Clamp Package Installation166.3 Coupling and Tube Assembly176.4 Turbulator Installation186.5 Reflector Installation196.6 Burner Installation21SECTION 7: Optional Heater Accessories227.1 U-Tube Configuration22Figure 17: U-Tube Heater Assembly Overview23Figure 18: U-Tube Heater Layout Overview247.2 Elbow Package Configuration25Figure 19: Reflector Joint Detail267.3 Reflector Side Extension277.4 Lower Clearance Shield Installation287.5 Two-Foot Decorative Grille Installation287.6 Protective Grille Installation30SECTION 8: Venting318.1 Venting318.2 Unvented Operation318.3 Horizontal Venting328.4 Vertical Venting328.5 Unvented Operation Tube Termination328.6 Length Requirements328.7 Horizontal Ventilation 4" (10 cm) Pipe32Figure 20: Tube Termination328.8 Vertical Ventilation 4" (10 cm) Pipe338.9 Common Side Wall Venting338.10 Common Vertical Venting348.11 Outside Combustion Air Supply35SECTION 9: Gas Piping37Figure 21: Gas Connection with Flexible Gas Hose38SECTION 10: Wiring3910.1 Standard Heater Configuration39Figure 22: Zone Sensor Wiring Diagram39Figure 23: Central Heater Jumper Settings40Figure 24: Satellite Heater Jumper Setting4110.3 Communication Wiring within a Zone of Heaters42(continued)43(continued)4310.4 Heat Demand Control Wiring44Figure 26: Thermostat Control Wiring Diagram44Table 4: Cable Requirements46Figure 27: Analog Control Signal Wiring Diagram47Figure 28: Potentiometer Control Wiring Diagram48(LonWorks [4-20 mA] optional)49optional)50with BACnet (optional)5110.5 Internal Wiring5210.6 Ladder Diagram5310.7 Line Voltage Power Wiring5410.8 Electrical Connection to the Burner5410.9 Low Voltage Control Wiring Installation55SECTION 11: Operation and Maintenance5611.1 Sequence of Operation5611.2 To Shut Off Heater5611.3 To Start Heater5611.4 Pre-Season Maintenance and Annual Inspection56SECTION 12: Troubleshooting5912.1 Control LED6012.2 General LED Codes6012.3 Troubleshooting Flow Chart6212.4 Manifold Gas Pressure Measurement6412.5 Pneumatic Connections65SECTION 13: Replacement Parts66SECTION 14: General Specifications6914.1 Material Specifications6914.2 Heater Specifications6914.3 Suspension Specifications6914.4 Controls Specifications69MODULATING Warranty71크기: 14.2메가바이트페이지: 82Language: English매뉴얼 열기