Check Driveline Length & Clearance
Check Driveline Collapsible Length
Refer to Figure 1-14 & Figure 1-17:
1.
Make sure driveline is properly installed and level 
before checking driveline collapsible length. Refer 
to “Driveline Installation” instructions on page 14 or 
“Driveline Installation” on page 19
2.
With driveline level, measure 1" (“B” dimension) 
back from universal joint shield to end of outer 
driveline shield as shown in Figure 1-16. 
3.
If measurement is 1" or more, skip to “Check 
Driveline Clearance”
 on
 this page. If measurement 
is less than 1", continue with “Shorten Driveline”.
Shorten Driveline
Refer to Figure 1-16:
Be sure to first check driveline collapsible length above. If 
required, shorten driveline as follows:
1.
Unhook driveline from tractor PTO shaft and pull 
outer and inner drivelines apart.
2.
Reattach outer driveline to tractor PTO shaft. Pull on 
inner and outer drivelines to be sure universal joints 
are properly secured.
3.
Hold inner and outer drivelines parallel to each other:
a. Measure 1" (“B” dimension) back from outer 
driveline universal joint shield and make a mark at 
this location on the inner driveline shield.
b. Measure 1" (“B” dimension) back from the inner 
driveline universal joint shield and make a mark at 
this location on the outer driveline shield.
4.
Remove driveline from tractor and gearbox shafts. 
5.
Measure from end of inner shield to scribed mark 
(“X” dimension). Cut off inner shield at the mark. Cut 
same amount off the inner shaft (“X1” dimension). 
6.
Measure from end of outer shield to scribed mark 
(“Y” dimension). Cut off outer shield at the mark. Cut 
same amount off the outer shaft (“Y1” dimension). 
7.
Remove all burrs and cuttings. 
8.
Apply multi-purpose grease to the inside of the outer 
shaft and reassemble driveline.
9.
Reattach driveline to cutter and tractor. For detailed 
instructions, see steps 11 to 13 under “3-Point Hook-
Up to RCF(M)3696 Cutters” 
on page 15 or st
eps 11 
and 12 under “Semi-Mount Hook-Up” on page 20.
Driveline Shortening
Figure 1-16
Check Driveline Clearance
1.
Make certain driveline yokes are properly attached.
2.
Start tractor and raise cutter up just enough to 
remove support blocks. Remove support blocks.
3.
Slowly and carefully raise cutter to ensure drawbar, 
tires, and other equipment on the tractor do not 
contact cutter frame. Move or remove drawbar if it 
interferes with cutter.
Refer to Figure 1-17:
4.
Raise and lower implement to find maximum 
extended driveline length. Check to make certain 
driveline does not exceed 25
o
 up or down.
5.
If needed, set tractor 3-point lift height to keep 
driveline from exceeding 25
o
 up.
Maximum PTO Driveline Movement During Operation
Figure 1-17
22311
IMPORTANT: Avoid premature driveline breakdown. 
A driveline that is operating must not exceed an 
angle of 25 degrees up or down while operating 3-
point lift.
24872