Philips 862474 Manual Do Utilizador

Página de 182
Performance Procedures
Testing the Monitor  
4-35
Calibration
Verification
Reset Pump
Operating
Time Counters
If the pump in the CO2 module is replaced, the Pump Operating Time counter should be reset 
to start counting operating time for the new pump.
Note
When the Pump Op Time has been reset a "CO2 Equipment Malfunction" INOP will be 
generated on restarting the monitor. To clear this INOP you must perform a flow check and 
store the flow in Diagnostic Mode (select Store Flow). 
Step
Action
1
Reopen the 5% gas valve and allow the value to stabilize.
2
Check that the value displayed on the monitor is correct and within the tolerance 
(see Step 2 in above section).
3
Disconnect the 5% calibration gas and connect the 10% calibration gas.
4
Open the valve on the flow regulator to allow 10% CO
2
 gas to flow into the 
monitor. Allow the value to stabilize.
5
Check that the value displayed on the monitor (X7) is correct and within the 
tolerance (see Step 6 above). If one or both values are not within tolerances, the 
CO
2
 module must be exchanged.
Step
Action
1
In the CO2 Test menu, select Pump Op Time.
2
Select Reset to Zero.