3M 800a Manual Do Utilizador
16
6.1 Uncrating
The envelope attached to the shipping box contains
the uncrating instructions of the machine
(Figure 6-1).
Cut straps. Cut out staple positions along the bottom
of the shipping box (or remove staples with an
appropriate tool
of the shipping box (or remove staples with an
appropriate tool
- Figure 6-2)
After cutting out or removing the staples, lift the
shipping box in order to clear the machine
(two persons required).
(two persons required).
Transport the machine with a fork-lift truck to the
operating position. Lift the pallet at the point indicat-
ed in
Figure 6-3 (weight of machine + pallet = See
Specifi cations).
6.2 Disposal of Packaging Materials
The 800a package is composed of:
- Wooden pallet
- Cardboard shipping box
- Wooden supports
- Metal fi xing brackets
- PU foam protection
- PP plastic straps
- Dehydrating salts in bag
- Special bag of laminated polyester/aluminium/
Polyethylene (sea freight package only)
- Polyethylene protective material
For the disposal of the above materials, please follow
the environmental directives or the law in your country.
6-UNPACKING
Figure 6-1
Figure 6-2
2011 August
800a-NA
Figure 6-5
Removal of Pallet
Loosen and remove nuts and brackets using the
open end spanner supplied in the tool box
open end spanner supplied in the tool box
(Figure 6-4).
A cardboard box is located under the machine body.
Retrieve the instruction manual for additional proce-
dures of the set up. The box also contains parts re-
moved for shipping, spare parts and tools
Retrieve the instruction manual for additional proce-
dures of the set up. The box also contains parts re-
moved for shipping, spare parts and tools
(Figure 6-5).
Figure 6-4
Figure 6-3