American Standard 2649BW Manual Do Utilizador

Página de 7
7 5 4 74 8 - 10 0   R ev.  C
5
5
A) Apply a bead of tub surround adhesive down 
each stud that will come in contact with the side 
panels being sure to stay below the line 
previously marked. 
B) Lay a bead of sealant along side panel mating 
surface and tub ledge. 
C) Align the top nailing flange of each side 
panel with pencil line marked. Press firmly into 
place to ensure proper adhesion to studs. 
Check alignment with all mating surfaces and 
reposition if necessary.  
D) Locate and drill a clearance hole in the center of the top  
nailing flange and centered on each stud (see arrows as shown). 
Also drill clearance holes in the front nailing flange on each side 
panel at approx. 12" intervals, centered on the flange (see arrows 
as shown). 
Install galvanized screws through each hole and into the studs, 
securing the wall panel.   
Sealant
(side panel 
mating surface)
Drill clearance
holes for screws
Tub Surround
Adhesive (studs)
Pencil line
Sealant (tub edge)