Haier RDE/RDG 350AW Manual Do Utilizador

Página de 80
English
15
4.  Thread a U.L. approved 30 Amp power cord. NEMA 14-30 type ST or SRDT  
through the strain relief.
5.  Attach the green power cord ground wire to the cabinet with green ground 
screw.
6.  Attach the white (neutral) power cord conductors to the outer cord and the  
green ground wire from the dryer harness to the brass-colored center   
terminal on the terminal block. Tighten the screw securely.
7.  Attach the red and black power cord conductors to the outer brass-colored 
terminals on the terminal block.  
Warning:  Do not make a sharp bend or crimp the wiring /conductor at 
connections.
8. Tighten the screws securing the cord restraint firmly against the power cord.
9. Tighten the strain relief nut securely so that the strain relief does not turn.
10. Reinstall the terminal block cover. 
NOTE:  DO NOT connect the dryer to L.P. gas service without 
converting the gas valve. An L.P. Conversion Kit must be 
installed by a qualified gas technician. 
1.  Remove the shipping cap from gas pipe at the rear of the dryer. 
2.  Connect a 1/2 inch (1.27cm) I.D. semi-rigid or approved pipe from gas supply line to 
the 3/8 inch (0.96cm) pipe located on the back of the dryer. Use a 1/2 inch to 3/8 
inch (1.27cm to 0.96cm) reducer for a connection. Apply an approved thread sealer 
that is resistant to the corrosive action of liquified gases on all pipe connections. 
3. Open the shutoff valve in the gas supply line. 
4.  Test all connections by brushing on a soapy water solution. NEVER TEST FOR GAS 
LEAKS WITH AN OPEN FLAME. 
5.  Connect the exhaust duct to the outside exhaust system. Use duct tape to seal all joints. 
6.  With the dryer in its final position, adjust one or more of the legs until the dryer is resting 
solid on all four legs. Place a level on top of the dryer. THE DRYER MUST BE LEVEL 
AND RESTING SOLID ON ALL FOUR LEGS. 
7.  Plug the power cord into a grounded outlet. NOTE: check to ensure power is OFF at 
circuit breaker/fuse box before plugging the power cord into the outlet. 
8.  Turn on the power at the circuit breaker/fuse box.  
WARNING
  Before operating the dryer, make sure the dryer area is clean and free 
from combustible materials, gasoline, and other flammable vapors. Also 
see that nothing (such as boxes, clothing, etc.) obstructs the flow of 
combustion and ventilation air through the louvered panel located on the 
rear of the dryer. 
9. Run the dryer through a cycle check for proper operation. 
    NOTE:  On gas dryers, before the burner will light, it is necessary for the gas line to 
be bled of air. If the burner does not light within 45 seconds the first 
time 
the dryer is turned on, the safety switch will shut the burner off. If this 
happens, turn the dryer to “OFF” and wait 5 minutes before making 
another attempt to light. 
    NOTE:
 Follow instructons supplied with kit.
GAS CONNECTIONS
GAS Dryer 
(RDG350A)