OPERATION
POWER VENTED PROPELLER UNITS 
DIRECT SPARK IGNITION
EXPLANATION OF CONTROLS (See Figure 10):
1.  The unit heater is equipped with a power vent system 
that consists of a power venter motor and blower, 
pressure switch, and sealed fl ue collector in place of 
the conventional draft diverter.
2.  The power venter motor is energized by the room 
thermostat through the integrated control board when 
a demand for heat is sensed. The pressure switch 
measures the flow through the vent system and 
energizes the direct spark ignition system beginning 
the pre-purge timing when the fl ow is correct.  
 The pressure switch MUST NOT be 
bypassed. The unit MUST NOT be fi red unless the 
power venter is operating. An unsafe condition 
could result.
3.  The direct ignition system consists of an ignition 
control module and a gas valve. When the pre-
purge period ends, the spark ignition system is 
energized, and the gas valve opens to supply gas 
to the burners. When the thermostat is satisfi ed, the 
vent system is de-energized and the valve closes to 
stop the fl ow of gas to the unit.
4.  The limit switch interrupts the fl ow of electric current 
to the control board, interrupting the fl ow of gas to the 
gas valve if the unit heater becomes overheated.
5.  Once the thermostat is satisfi ed, or the limit switch 
interrupts the fl ow of electric current to the control 
board, the unit will begin a post-purge period. When 
the post-purge period ends, the power venter motor 
is de-energized.
6.  The fan operation is delayed 30 seconds once the 
thermostat is closed, and continues operation for 30 
seconds after the thermostat opens.
NOTICE: The start-up fan delay  must not exceed 30 
seconds from a cold start.
7.  The wall ther mostat, supplied optionally, is a 
temperature sensitive switch that operates the vent 
and ignition system to control the temperature of 
the space being heated. The thermostat must be 
mounted on a vertical, vibration-free surface free 
from air currents and in accordance with the furnished 
instructions (also refer to Electrical Section).
START-UP (Also refer to lighting instruction plate 
equipped on the unit)
1.  Open the manual gas valve in the gas supply line to 
the unit heater. Loosen the union in the gas line to 
purge it of air. Tighten the union and check for leaks.
 Never use an open flame to 
detect gas leaks. Explosive conditions may 
exist which could result in personal injury or 
death.
2.  Open the manual valve on the unit heater.
3.  Turn ON the electrical power.
4.  The unit should be under the control of the thermostat.  
Turn the thermostat to the highest point and determine 
that the power venter motor starts and the burners 
ignite. Turn the thermostat to the lowest point and 
determine that the power venter motor shuts off and 
the burners are extinguished.
5.  Turn the thermostat to the desired position.
6.  See Gas Input Rate and Adjustments sections.
SHUT DOWN
1.  Turn the valve selector lever to the “OFF” position.
2.  Turn off the electricity.
3.  To relight, follow “start-up” instructions.
See Figures 10-17 for parts/identifi cation.