Enerco HS200CV Manual Do Utilizador

Página de 10
5
Operating Instructions and Owner’s Manual
Enerco Group, Inc. | Convection Construction Heater
CAUTION: NEVER IGNITE AND / OR RUN THIS HEATER UNLESS THE SHELLS ARE
FULLY EXTENDED AND LOCKED INTO POSITION.
STEP 2: LIFT OUTER SHELL STRAIGHT UP. CARE MUST BE
TAKEN TO PROTECT HANDS DURING LIFT.
STEP 3: LIFT OUTER SHELL UNTIL ALL THREE CLIPS
INGAGE SLOTS IN LOWER SHELL. WHEN THIS HAPPENS,
THE SCREW HOLES WILL LINE UP.
STEP 4: LOCK THE CLIP INTO PLACE WITH 3 SCREWS AS
SHOWN.  THE HEATER MUST NOT BE OPERATED UNLESS THE
OUTER SHELL IS PROPERLY EXTENDED AND FULLY LOCKED
INTO PLACE.
CAUTION: NEVER IGNITE AND / OR RUN THIS HEATER UNLESS THE SHELLS ARE
FULLY EXTENDED AND LOCKED INTO POSITION.
STEP 1: HEATER AS RECEIVED OUT OF BOX.BEFORE
LIFTING OUTER SHELL PROTECT HANDS. NEVER
GRASP BARE METAL WITHOUT HAND PROTECTION.
Make sure clip goes into
slot in lower shell.
3 Places
Lock shells together and
clips in place with screws
in each clip. 3 Screws
Total.