Enerco HS200CV Manual Do Utilizador
5
Operating Instructions and Owner’s Manual
Enerco Group, Inc. | Convection Construction Heater
CAUTION: NEVER IGNITE AND / OR RUN THIS HEATER UNLESS THE SHELLS ARE
FULLY EXTENDED AND LOCKED INTO POSITION.
FULLY EXTENDED AND LOCKED INTO POSITION.
STEP 2: LIFT OUTER SHELL STRAIGHT UP. CARE MUST BE
TAKEN TO PROTECT HANDS DURING LIFT.
TAKEN TO PROTECT HANDS DURING LIFT.
STEP 3: LIFT OUTER SHELL UNTIL ALL THREE CLIPS
INGAGE SLOTS IN LOWER SHELL. WHEN THIS HAPPENS,
THE SCREW HOLES WILL LINE UP.
INGAGE SLOTS IN LOWER SHELL. WHEN THIS HAPPENS,
THE SCREW HOLES WILL LINE UP.
STEP 4: LOCK THE CLIP INTO PLACE WITH 3 SCREWS AS
SHOWN. THE HEATER MUST NOT BE OPERATED UNLESS THE
OUTER SHELL IS PROPERLY EXTENDED AND FULLY LOCKED
INTO PLACE.
SHOWN. THE HEATER MUST NOT BE OPERATED UNLESS THE
OUTER SHELL IS PROPERLY EXTENDED AND FULLY LOCKED
INTO PLACE.
CAUTION: NEVER IGNITE AND / OR RUN THIS HEATER UNLESS THE SHELLS ARE
FULLY EXTENDED AND LOCKED INTO POSITION.
FULLY EXTENDED AND LOCKED INTO POSITION.
STEP 1: HEATER AS RECEIVED OUT OF BOX.BEFORE
LIFTING OUTER SHELL PROTECT HANDS. NEVER
GRASP BARE METAL WITHOUT HAND PROTECTION.
LIFTING OUTER SHELL PROTECT HANDS. NEVER
GRASP BARE METAL WITHOUT HAND PROTECTION.
Make sure clip goes into
slot in lower shell.
3 Places
slot in lower shell.
3 Places
Lock shells together and
clips in place with screws
in each clip. 3 Screws
Total.
clips in place with screws
in each clip. 3 Screws
Total.