Desa (V)G42R/50R Manual Do Utilizador

Página de 16
www.desatech.com
109493-01N
11
VenTing insTallaTion
Continued
FINISHING THE FIREPLACE
Combustible materials, such as wallboard, gypsum 
board, sheet rock, drywall, plywood, etc. may make 
direct contact with sides and top around the fireplace 
face. It is important that combustible materials do 
not overlap the face itself. Brick, glass, tile or other 
noncombustible materials may overlap the front 
face provided they do not obstruct essential open-
ings like louvered slots or any other opening. When 
overlapping with a noncombustible facing material, 
use only noncombustible mortar or adhesive.
opTional gas line 
insTallaTion
Gas line hook up should be done by your supplier 
or a qualified service person.
Note
: Before you proceed, make sure your gas 
supply is turned off.
Use only a 1/2" black iron pipe and appropriate 
fittings. 
1.  Remove knockout indentation on refractory or 
firebrick wall located above the refractory hearth 
floor. The knockout indentation must be firmly 
tapped with any solid object such as a 1/2" dowel 
until it is released. Remove fragmented portions 
of refractory (see Figure 18).
2.  Remove gas line cover plate located on either 
side of fireplace and pull out insulation from gas 
line conduit sleeve. Save insulation for reuse. 
Replace screws.
10'
' Min.
10'
3' Min.
' Min.
3' Min.
Level of 
Flue Gas 
Outlet
Figure 17 - 10 Foot Rule
Figure 18 - Gas Line Knockout
Side 
Firebrick 
Finished 
Side
Refractory 
Knockout 
Plug
Outside of 
Fireplace
Gas Line 
Conduit
Insulation
Gas 
Conduit 
Cover
1/2" Dowel
Remove 
Knockout
10 FOOT RULE
All flue gas outlet chimney terminations must 
extend a minimum of 3 feet in height above the 
highest point where it passes through the roof and 
must be at least 2 feet above the highest point of 
the roof that is within a horizontal distance of 10 
feet (see Figure 17).
3.  Run a 1/2" black iron gas line into the fireplace 
through the rear at gas line conduit sleeve (if 
using a raised platform, add height). Provide 
sufficient gas line into fireplace chamber for 
fitting  connection  (see  Figure  19).  Note
Secure incoming gas line to wood framing to 
provide rigidity for threaded end.
4.  Repack insulation around gas line and into 
sleeve opening. Seal any gaps between gas line 
and refractory knockout hole with refractory ce-
ment or commercial furnace cement, Install the 
gas appliance or cap off gas line if desired.
Seal 
Opening 
with 
Refractory 
Cement
Outside of 
Fireplace
Gas 
Line 
Conduit
Repack 
Insulation
Incoming 
1/2" Black 
Iron Pipe
Side 
Firebrick 
Finished 
Side
Provide Enough Threaded 
End for Fitting Connection
Figure 19 - Gas Line Installation