INSTALLATION (CONTINUED)
14
Evacuation
1. Attach the charge hose end described in the leak test
area to a vacuum pump to evacuate the tubing and indoor
unit.  Confirm the “Lo” knob of the manifold valve is open.
Then, run the vacuum pump. The operation time for evac-
uation varies with the tubing length and capacity of the
pump. The following table shows the amount of time for
evacuation:
2. When the desired vacuum is reached, close the “Lo” knob
of the manifold valve and stop the vacuum pump.
Finishing the job
1. With a hex wrench, turn the narrow tube service valve
stem counter-clockwise to fully open the valve.
2. Turn the wide tube service valve stem counter-clockwise
to fully open the valve.
CAUTION:
To avoid gas from leaking when removing the charge hose,
make sure the wide tube service valve is fully open and
turned all the way out.
3. Loosen the charge hose connected to the wide tube ser-
vice port slightly to release the pressure, then remove the
hose.
4. Replace the threaded cover on the wide tube service port
and fasten it securely. This process is very important to
prevent gas from leaking from the system.
5. Replace the valve caps at both wide and narrow service
valves and fasten them securely.
This completes air purging with a vacuum pump. The air
conditioner is now ready to test run.
Lo
Hi
Pressure
Gauge
Manifold Valve
Outdoor Unit
Indoor Unit
Charge Hose
Vacuum
Pump
If tubing length is less than 
33 ft. (10 m)
10 min. or more
If tubing length is longer than 
33 ft. (10 m)
15 min. or more
Required time for evacuation when 30 gal/h vacuum 
pump is used