Crown Boiler BWC151 Manual Do Utilizador

Página de 81
Table 4.2: Clearances From Vent Piping To Combustible Construction
TYPE OF VENT PIPE
PIPE DIRECTION
ENCLOSURE
MINIMUM CLEARANCE
TO COMBUSTIBLE
  MATERIAL
80/125 and 60/100mm
 CONCENTRIC VENTING
VERTICAL OR 
HORIZONTAL
ENCLOSED ON ALL FOUR SIDES
0”
HEAT FAB SAF-T VENT
PROTECH FASNSEAL
Z-FLEX Z-VENT III
METAL-FAB CORR/GUARD
VERTICAL OR 
HORIZONTAL
AT LEAST ONE SIDE OPEN, 
COMBUSTIBLE MATERIAL ON A 
MAXIMUM OF THREE SIDES
1” 
HEAT FAB SAF-T VENT
PROTECH FASNSEAL
Z-FLEX Z-VENT III
METAL-FAB CORR/GUARD
HORIZONTAL OR VERTICAL 
WITH OFFSETS
ENCLOSED ON ALL FOUR SIDES
2-1/2” 
HEAT FAB SAF-T VENT
PROTECH FASNSEAL
Z-FLEX Z-VENT III
METAL-FAB CORR/GUARD
VERTICAL WITH NO OFFSETS
ENCLOSED ON ALL FOUR SIDES
2-1/2” 
5