Installation
M
ODEL
 1700 B
RICK
 P
LACEMENT
:
COMPLETE THE STOVE AND SMOKE PIPE INSTALLATION BEFORE PLACING THESE BRICKS.
1. Place the four (4) full size bricks along each side of the firebox and one (1) full size brick on either 
side of the back of the firebox.
2. To place the floor bricks, lay the two (2) partial bricks along the back of the floor. Then on the left, lay 
three (3) full size bricks and on the right, lay two (2)  full size bricks in the center and the half brick in 
the front (for the ash dump). The spaces between the bricks will soon fill with ashes.
When replacing bricks, use only pumas type fire bricks.
TOTAL BRICKS:
15 - Full size bricks  9” long x 4.5” wide x 1.25” thick
 
 
 
(22.9 cm long x 11.4 cm wide x 3.2 cm thick)
2 - Partial bricks       9” long x 3” wide x 1.25” thick
 
 
 
(22.9 cm long x 7.6 cm wide 3.2 cm thick)
1 - Half brick   
4.5 “ long x 4.5” wide x 1.25” thick
 
 
 
(11.43 cm long x 11.43 cm wide x 3.175 cm thick)
�����
���� �
��� ��
���
����
������
� �����
Figure 35: Brick Placement for 1700 shown with Secondary Air Channel and Tubes.