Honeywell MS-9200UDLS Manual Do Utilizador

Página de 188
Installation
Mounting Transformer
28
MS-9200UDLS   PN 52750:A    11/04/05
2.2  Mounting Transformer
One XRM-24(E) transformer is supplied standard with the control panel.  An optional 
second XRM-24(E) transformer can be ordered and installed to provide maximum 
system power.  Install the transformers in the locations indicated in the following 
illustration.
1. When the location is dry and free of construction dust, install the chassis/
transformer/circuit board assembly.
2. Mount the chassis to the backbox by aligning the two mounting tabs with the 
slots in the backbox, then position the two mounting hole tabs over the studs with 
nuts located in the upper portion of the backbox.
3. Slide the tabs located on the bottom of the chassis into the mounting slots in the 
backbox by pressing the chassis down.
4. Secure the chassis to the backbox by tightening the two mounting nuts (#10-32) 
at the top, and to ensure proper grounding, use a 3/8” nut driver or socket.
5. If the main circuit board is not already attached to the chassis, install it by 
positioning the ten mounting holes over the studs on the chassis and secure with 
the supplied screws.
6. Connect the Standard XRM-24 Transformer plug to Transformer 1 Connector 
J10 on the FACP main circuit board
7. Connect the Optional XRM-24 Transformer plug to Transformer 2 Connector J11 
on the FACP main circuit board.
8. Complete the installation as detailed in the following sections.
Figure 2.2 MS-9200UDLS Main Board/Chassis Installation
Standard XRM-24 Transformer
Optional XRM-24 Transformer
Mounting Slot
Mounting Studs