Chief Manufacturing PLP Series Manual Do Utilizador

Página de 8
Installation Instructions
PLP Series
4
CONTENTS
DIMENSIONAL DRAWING ..................................... 3
TOOLS REQUIRED FOR INSTALLATION.............. 4
PARTS LIST .............................................................. 4
PLP INSTALLATION ................................................ 5
Select Mounting Location........................................ 5
Mount the PLP ........................................................ 6
ATTACH PSB TO THE DISPLAY............................. 7
INSTALL THE DISPLAY .......................................... 7
REMOVE THE DISPLAY.......................................... 7
TILT ADJUSTMENT ................................................. 8
CABLE CONNECTION ............................................. 8
TOOLS REQUIRED FOR
INSTALLATION
Drill and drill bit set
Socket wrench set
NOTE: Other tools may be required depending on your
method of installation.
Figure 1. PLP Parts
PARTS LIST
Prior to assembly, unpack the carton completely. Verify
contents listed in Table 1 and Figure 1.
Read installation instructions completely. If you are
missing any of the listed parts, contact Customer Service
at: 1-800/582-6480.
Table 1. Parts List
REF
DESCRIPTION
QTY
10
PLP Series Wall Mount
1
20
BOLT, Lag, 5/16” x 2-½”
4
30
WASHER, 5/16”
4
10
20 - 4 Lag Bolts
30 - 4 Washers