Peerless Industries DS508 Manual Do Utilizador

Página de 9
Visit the Peerless Web Site at www.peerlessmounts.com 
           For customer care call 1-800-865-2112 or 708-865-8870.
6 of 9
ISSUED: 03-05-09  SHEET #:125-9054-2   07-15-09
Using a stud finder, locate and mark the edges of the metal stud used in mounting this product. Use of an edge
to edge stud finder is highly recommended. Use a level to draw a level, vertical line down the center of the stud.
Level wall plate, and mark the center of the six mounting holes. Make sure that the mounting holes are on the stud
centerlines. Drill two 1/2" holes through drywall and metal studs.
NOTE: It may be necessary to drill 5/32" pilot
holes prior to drilling 1/2" holes. Install togglers (
P) as shown in figure 1.3. Loosely fasten wall plate to wall using six  
1/4-20 x 2-1/2" screws (
N) and six 1/4" washers (O) as shown in figure 1.4. Level, hold, and then tighten all screws.
1
•  Drywall must be 1/2" or thicker, and metal stud must be 24 gauge or thicker.
•  Make sure that the wall will safely support the combined load of the equipment and all attached hardware and
components.
•  Make sure that togglers are anchored into the center of the studs. The use of an "edge to edge" stud finder is highly
recommended.
WARNING
Installation to Metal Studs
A
P
N
fig. 1.4
O
Rotate toggler (
O) clockwise to wedge it 
against inside walls of metal stud.
Push into hole.
Pivot end of toggler (
O).
Slide plastic cap forward while pulling back
firmly on ring.
Break off excess.
O
1
2
3
4
5
fig. 1.3
drill 
1/2"
hole
O
O
O
O