Lochinvar SNR150-100 Manual Do Utilizador

Página de 76
Revision Notes:  Revision A (ECO #C02299) initial release.
Revision B (ECO #C02870) reflects the addition of a mixing valve to the 
piping diagrams (FIG.’s 6-2 and 6-3, pgs. 32 - 34).
Revision C (ECO #C02738) reflects edits made to the Gas Valve 
Adjustment Procedure for Model SNA400-125 on page 69.
Revision D (ECO #C03223) reflects edits made to the high altitude 
section on page 7.
Revision E (ECO #C03735) reflects the addition of stainless steel 
venting, hydro changes and the addition of the Anode Rod(s) section.
Revision F (ECO #C03974) reflects Delta T updates and additions.
Revision G (ECO #C05457) update the vent table to reflect Schedule 
80 as acceptable CPVC material (R02799), reflects the addition of 
the illustrations disclaimer on all the piping drawings (ECR #R02431), 
add stainless steel as acceptable material in a closet or alcove 
installation (R02900), add flex-smooth wall to the FasNSeal material 
(ECR #R02845), add the left side service clearance dimensions, and 
update the HEX cleaning procedure to reflect the new HEX cleaning kit 
(R02634).
Revision H (ECO C06485) reflects the addition of required amperage 
rating (15 amp) to the “Power Cord Connection” section on page 43 
as well as the update of the piping diagrams on pages 36 - 38 and the 
addition of  Figure 12-3 on page 61 with a new notice about rope gasket 
on heat exchanger door. Clearances from hot water pipe have also been 
updated on page 8 within the “Clearances from combustible materials” 
section, as well as Figures 1-1 and 1-2 on page 9. Table 2A on page 
18 was also updated.
Revision I (ECO C07981) reflects the addition of the O-temp switch.
Revision J (ECO #C09803) reflects the addition of the new Polypropylene 
Vent material section, rearranging the vent section, additional information 
added to the humidity warning on page 8, edits made to the O-Temp 
switch definition on page 4, addition of the AHRI and ASME logos 
(R05009), along with the addition of the note on pg. 46 to not install the 
neutralization kit horizontally (ECR R04791).
Revision K (ECO #C10143) reflects the removal of the “GV/RELAY 
FAIL” FAULT (ECR #R05239) and updates made to the ignition timing 
information.
SWH-I-S Rev K
04/12