IBM 21Y Manual Do Utilizador

Página de 210
16
Netfinity 3500-M20 – Type 8657 Models 21Y, 22Y, 31Y, 32Y,
7. Insert the new battery: 
a. Tilt the battery so that you can insert it into the 
front of the socket, under the battery clip.
b. As you slide it under the battery clip, press the 
battery down into the socket.
8. Reinstall any adapters that you removed.  
9. Reinstall the top cover. 
Note: You must wait approximately 20 seconds after 
you plug the power cord of the server into an 
electrical outlet before the power control button 
becomes active.
10. Start the Configuration/Setup Utility program and set 
configuration parameters as needed.  Refer to “Using 
the Configuration/Setup Utility program” on page 33
.
Temperature checkout
Proper cooling of the system is important for proper opera-
tion and system reliability.  For a typical Netfinity server, you 
should make sure:
Each of the drive bays has either a drive or a filler panel 
installed
The top cover is in place during normal operation
There is at least 50 mm (2 inches) of ventilated space 
at the sides of the server and 100 mm (4 inches) at the 
rear of the server
The top cover is removed for no longer than 30 minutes 
while the server is operating
Cables for optional adapters are routed according to 
the instructions provided with the adapters (ensure that 
cables are not restricting air flow)
The fans are operating correctly and the air flow is 
good
A failed fan is replaced within 1 hour.