Polycom (RMX) 1500 Manual Do Utilizador

Página de 1183
RealPresence Collaboration Server (RMX) 1500/1800/2000/4000 Administrator’s Guide 
Polycom®, Inc. 
713
Select the appropriate Hot Backup Triggers check boxes:
Alternatively, click the Trigger Failover Manually button when you want to trigger the Hot Backup 
manually and activate the Slave MCU.
A confirmation message is displayed.
Click Yes to continue the Hot Backup process or click No to cancel the Hot Backup process.
Click OK.
Modifications to the Master MCU Requiring System Reset
Modifications to the configuration of the Master MCU that require a System Reset cannot be performed 
while Hot Backup is enabled.
To modify the Master MCU configuration:
Disable the Hot Backup on the Master and Slave MCUs.
Modify the Master MCUs configuration.
Reset the Master MCU.
When the reset is complete, enable Hot Backup on the Master and Slave MCUs.
If required, reset the Slave MCU.
Hot Backup Triggers
Hot Backup Trigger
Description
Lost connection with management 
port
Initiates the Hot Backup switch from the Master to the Slave MCU 
when the connection to the management port is lost on the Master 
MCU. This trigger is always set.
Lost connection with media port
Initiates the Hot Backup switch from the Master to the Slave MCU 
when the connection with an active media port is lost on the Master 
MCU.
Lost connection with signalling port
Initiates the Hot Backup switch from the Master to the Slave MCU 
when the connection with an active signalling port is inactive for a 
duration of 30 seconds on the Master MCU. A system flag, 
ETH_INACTIVITY_DURATION, can be added and configured to 
modify the duration of inactivity of the signalling port. Default value 
is 30 seconds; Minimum value is 20 seconds.
Lost connection with ISDN card
Initiates the Hot Backup switch from the Master to the Slave MCU 
when the connection with an ISDN card is disconnected on the 
Master MCU.