Alamo 1595 Manual Do Utilizador
OPERATION
1595 01/11
Operation Section 4-30
© 2011 Alamo Group Inc.
OPERA
T
ION
Side cutting is a good technique for cutting down a
big pile.
big pile.
If the pile sides are too high and liable to cause
cave-in, use loader to break down the sides until a
slot can be cut over the top.
cave-in, use loader to break down the sides until a
slot can be cut over the top.
Another method for large dirt piles is to build a ramp
approach to the pile.
approach to the pile.