Rhino Mounts DB150 Manual Do Utilizador

Página de 196
OPERATION
DB150   07/11
Operation Section 4-37
© 2011 Alamo Group Inc.
OPERA
T
ION
12.2 Hauling the Tractor and Implement
Before transporting a loaded tractor and implement,
measure the height and width dimensions and
gross weight of the complete loaded unit.  Ensure
that the load will be in compliance with the legal
limits set for the areas that will be traveled through.
OPS-U- 0024_TK
 
Use adequately sized and rated trailers and
equipment to transport the tractor and implement.
Consult an authorized dealer to determine the proper
equipment required.  Using adequately sized chains,
heavy duty straps, cables and/or binders, securely tie
down both the front and rear of the tractor utilizing the
proper tie  down locations as specified by the tractor
manufacturer. OPS-U- 0025