Jonsered LT2220 CMA2 Manual Do Utilizador

Página de 32
8
Fig. 4D
NOTE: The strap hook must go through the discharge chute 
only. Do not allow the hook to enter the slot in the tractor 
back plate. This will allow the dis charge chute to float with the 
mower deck when moving on uneven terrain.
02306
HOOK
BACKPLATE
SLOT
DIS CHARGE
CHUTE
Fig. 5A
TO ASSEMBLE BAGGER (See Figs. 5A-5C) 
•  Unfold bag by pivoting front bagger tube all the way 
forward and pressing the bottom vinyl binding onto the 
tube.
• 
Inside the bag, install spreader bars and retainer springs 
onto pins on both sides of bag as shown.
• 
Press the vinyl bindings onto the sides of front bagger 
tube.
•  Slide the bagger dump handle through the hole in the 
bagger top, install the clevis pin 10 x 44mm and secure 
with retainer spring.
•  Push cap over end of bagger dump handle.
NOTE: For future use, the clevis pin may be removed in order 
to use the handle to clear the chute in the event it has become 
clogged.
Fig. 5C
ASSEMBLY
BAGGER ADJUSTMENT  (See Fig. 6 & 7)
For proper bag function and appearance, it may be nec-
 es sary to adjust the bagger assembly. There should be 6mm 
(1/4")-9mm (3/8") gap between the bagger top and fender 
and the bagger top surface should be even with the top 
surface of the fender. To adjust bagger position:
Fig. 6
HORIZONTAL ADJUSTMENT
•  Slightly loosen the nuts securing the bagger RH and 
LH hor i zon tal adjustment brackets. Loosen only enough 
so the brackets keep their position, but allow them to 
be moved.  
• 
Move the brackets the amount forward or back ward you 
wish the bag assembly to move. Retighten the  nuts 
securely. 
VERTICAL ADJUSTMENT 
•  Slightly loosen the nuts securing the vertical adjust-
ment brackets. Loosen only enough so the brackets 
keep their position, but allow them to be moved. 
• 
Move the brackets the amount up or down you wish the 
bag assembly to move. Retighten the nuts securely. 
•  Reinstall the bagger as sem bly and check the bagger 
to fender fit.  If necessary, repeat the procedure until 
proper fit is attained.
02
90
5
VINYL BINDING
FRONT BAGGER TUBE
02
906
RETAINER SPRING
SPREADER BARS
RETAINER 
SPRING
VINYL 
BINDING
Fig. 5B
02
907
DUMP HANDLE 
TUBE
CLEVIS PIN 10 X 44MM
RETAINER SPRING
CAP
Fig. 7
02967
TOP SURFACES 
EVEN
6MM (1/4") - 9MM (3/8")
HORIZONTAL 
ADJUSTMENT 
BRACK ET
VERTICAL 
ADJUSTMENT 
BRACK ET
BAGGER 
LATCH