Jacuzzi J-210 Manual Do Utilizador

Página de 43
page 10
7.0 Electrical Wiring Instructions
IMPORTANT NOTICE: The electrical wiring of this spa must meet 
the requirements of the National Electrical Code/USA (NEC) and any 
applicable state or local codes. The electrical circuit must be installed 
by a qualified electrician and approved by a local building/electrical 
inspection authority.
1.  Convertible 120/240V Power Models:
 
120V “Plug-in” Operation: This spa must operate on the supplied 
120V GFCI cord at its original length or must be hard-wired for 
longer runs. NEVER USE AN ExTENSION CORd FOR ANy REA-
SON! 
Export J-210 / J-220 1-Pump Models (50Hz)
 
 
230V/20A* 
230V/30A** 
          
Voltage: 
230 VAC 
230 VAC 
 
# of Wires: 
Frequency: 
50Hz 
50Hz 
Current Draw: 
15A 
21A 
 
Circuit Breaker: 
20A 
30A 
 
*   In the 20A configuration, the heater will not operate while the jets  
 
pump is running in high speed. 
This is the factory setting.
**  In the 30A configuration, the heater will operate while the jets pump  
 
is running in high speed.
Export J-230 2-Pump Model (50Hz)
 
230V/20A* 
230V/30A** 
230V/40A*** 
Voltage: 
230 VAC 
230 VAC 
240 VAC 
# of Wires: 
Frequency: 
50Hz 
50Hz 
50Hz
Current Draw: 
15A 
23A 
2A 
Circuit Breaker: 
20A 
30A 
40A 
In 20A configuration, the heater will not operate while either jets  
 
pump is running in high speed.  
This is the factory setting.  Note:  
 
pump 2 runs only in high speed. 
**  In the 30A configuration, the heater will operate while one jets   
 
pump is running in high speed.  Note: pump 2 runs only in high   
 
speed. 
***  In 40A configuration, the heater will operate while both jet pumps 
 
are running in high speed.  Note: pump 2 runs only in high speed.