Black Box MPSH16-D20-120V Manual Do Utilizador

Página de 193
OUTLET MANAGED PDU
 
138
When the "Confirm Plug Actions" button is pressed, the Outlet Managed PDU 
will display a screen which lists the selected action(s) and asks for confirmation 
before proceeding.  To implement the selected action(s), click on the "Execute Plug 
Actions" button.  The Outlet Managed PDU will display a screen which indicates 
that a switching operation is in progress, then display the Plug Status screen when 
the command is complete.  At that time, the Status Screen will list the updated On/
Off status of each plug.
Notes:  
•  When switching and reboot operations are initiated, Boot/
Sequence Delay times will be applied as described in Section 5.7.
•  If a switching or reboot command is directed to a plug that 
is already in the process of being switched or rebooted by a 
previous command, then the new command will be placed in a 
queue until the plug is ready to receive additional commands.
•  If the Status column in the Plug Control Screen includes an 
asterisk, this means that the corresponding outlet is busy 
completing a previously invoked command.
•  When the Plug Control Screen is displayed by an account that 
permits Administrator or SuperUser level commands, all switched 
outlets will be displayed.
•  When the Plug Control Screen is displayed by a User level 
account, the screen will only include the switched outlets that are 
allowed by the account.