GENERAL INFORMATION
sEctioN 1.7
oPEratiNG iNstructioNs
10-20 kW – INSTALLATION ASSISTANT:
Upon first power up of the generator, the display inter-
face  will  begin  an  installation  assistant. The  assistant 
will  prompt  the  user  to  set  the  minimum  settings  to 
operate. These settings are simply: Current Date/Time 
and  Exercise  Day/Time.  The  maintenance  intervals 
will be initialized when the exercise time is entered for 
the first time (Figure 3.2).
The exercise settings can be changed at any time via 
the "EDIT" menu (see Appendix, "Menu System").
If  the  12  Volt  battery  is  disconnected  or  the  fuse 
removed, the Installation Assistant will operate upon 
power  restoration. The  only  difference  is  the  display 
will  only  prompt  the  customer  for  the  current  Time 
and Date.
if  the  installer  tests  the  generator  prior  to  instal-
lation,  press  the “enter”  key  to  avoid  setting 
up  the  exercise  time. this  will  ensure  that  when 
the  customer  powers  up  the  unit,  he  will  still  be 
prompted to enter an exercise time.
note: the exerciser will only work in the auto mode 
and will not work unless this procedure is performed. 
the current date/time will need to be reset every time 
the  12 Volt  battery  is  disconnected  and  then  recon-
nected, and/or when the fuse is removed.
to Select automatic operation
The  following  procedure  applies  only  to  those  instal-
lations  in  which  the  air-cooled,  automatic  standby 
generator  is  installed  in  conjunction  with  a  transfer 
switch. Transfer  switches  do  not  have  an  intelligence 
circuit  of  their  own.  Automatic  operation  on  transfer 
switch  and  generator  combinations  is  controlled  by 
circuit board action.
To select automatic operation when a transfer switch 
is  installed  along  with  a  home  standby  generator, 
proceed as follows:
1.  Check  that  the  transfer  switch  main  contacts  are  at 
their UTILITY position, i.e., the load is connected to the 
power supply. If necessary, manually actuate the switch 
main contacts to their UTILITY source side. See Part 3 
of this manual, as appropriate, for instructions.
2.  Check that utility source voltage is available to transfer 
switch terminal lugs N1 and N2 (2-pole, 1-phase transfer 
switches).
3.  Set  the  generator  AUTO-OFF-MANUAL  switch  to  its 
AUTO position.
4.  Actuate the generator main line circuit breaker to its “On” 
or “Closed” position. With the preceding Steps 1 through 
4 completed, a dropout in utility supply voltage below a 
preset  level  will  result  in  automatic  generator  cranking 
and start-up. Following startup, the transfer switch will be 
actuated to its “Standby” source side, i.e., loads powered 
by the standby generator.
manual tranSFer to “StandBy” and 
manual Startup
To transfer electrical loads to the “Standby” (generator) 
source  and  start  the  generator  manually,  proceed  as 
follows:
1.  On  the  generator  panel,  set  the  AUTO-OFF-MANUAL 
switch to OFF.
2.  On the generator, set the main line circuit breaker to it’s 
OFF or “Open” position.
3.  Turn OFF the power supply to the transfer switch, using 
whatever means provided (such as a utility source line 
circuit breaker).
4.  Manually  actuate  the  transfer  switch  main  contacts  to 
their “Standby”  position,  i.e.,  loads  connected  to  the 
“Standby” power source side.
note:  For  instructions  on  manual  operation  of 
transfer switches, see part 3.
5.  On  the  generator  panel,  set  the  AUTO-OFF-MANUAL 
switch to MANUAL. The engine should crank and start.
6.  Let the engine warm up and stabilize for a minute or two 
at no-load.
7.  Set the generator main line circuit breaker to its “On” 
or “Closed”  position. The  generator  now  powers  the 
electrical loads.
manual ShutdoWn and retranSFer 
Back to “utility”
To  shut  the  generator  down  and  retransfer  electrical 
loads back to the UTILITY position, proceed as follows:
1.  Set the generator main line circuit breaker to its OFF or 
“Open” position.
2.  Let the generator run at no-load for a few minutes, to cool.
3.  Set  the  generator AUTO-OFF-MANUAL  switch  to  OFF. 
Wait for the engine to come to a complete stop.
4.  Turn  off  the  utility  power  supply  to  the  transfer  switch 
using whatever means provided (such as a utility source 
main line circuit breaker)
5.  Manually  actuate  the  transfer  switch  to  its  UTILITY 
source side, i.e., load connected to the utility source.
6.  Turn  on  the  utility  power  supply  to  the  transfer  switch, 
using whatever means provided.
7.  Set the generator AUTO-OFF-MANUAL switch to AUTO.