Desa PG15EA Manual Do Utilizador

Página de 12
www.desatech.com
115423-01A
8
REASSEMBLY POINTS
Because  this  is  an  outdoor  product  where  the 
control of water is important, the following steps 
for assembly  must be followed.
1.  The closed cell foam gasket must seal the hex 
shaped pan to the inside of the plastic housing 
(see Figure 8). The seal is to be completely 
even in the corners of joined parts.
2.  The tubular heating element rubber sealing 
washers must be against the top surface of the 
steel pan and under the brass flat washers as 
shown in Figure 9. Nuts on opposite side of pan 
must be tightened 1/2 turn past finger tight.
3.  Apply a SMALL drop of thread locking seal-
ant (rated to 300° F, such as Loctite Thread  
Locker  Blue)  to  each  of  the  thermal  reset 
switch  mounting  screws  (see  Figure  10). 
Torque screws to 6 to 9 inch-pounds.
4.  The tip switch cover must isolate tip switch 
from metal base as shown in Figure 11.
5.  To complete grounding of heater, all ground 
wires must be fixed with screws as originally 
assembled by the manufacturer. Additionally, 
internal tooth washers must be against the steel 
pan and under nuts as shown in Figure 12, for 
the tubular heating element.
6.  No wires should be seen through openings in 
bottom of heater (see Figure 13).
Figure 8 - Foam Gasket
Figure 9 - Tubular Heating Element 
Sealing Washers
Figure 10 - Thermal Reset Switch 
Mounting Screws
Figure 11 - Tip Switch Cover
Figure 12 - Grounding of the Tubular 
Heating Element
Figure 13 - Air Openings in Bottom of 
Heater
Brass Flat 
Washer
Rubber 
Sealing 
Washer