Klark Teknik DN540 Manual Do Utilizador

Página de 54
DN540
Operator Manual
9
 
Chapter 3: Getting Started
Observing the IMPORTANT SAFETY INSTRUCTIONS at the front of the manual and the 
guidelines in "Precautions" on page vii, carry out the following to get your DN540 unit 
fully operational.
Unpacking
Carefully unpack your DN540 equipment package.
Then, inspect the DN540 unit carefully for any signs of damage that may have occurred 
during transit and notify the courier immediately if you discover any.
Check the contents of your DN540 equipment package.  If there are any parts missing, 
incorrect or faulty, please contact your local distributor or Klark Teknik at the address at 
the front of this manual.  The following is a list of the main items contained in the 
DN540 package.
Please retain the original packing in case you should need to return the equipment to 
the manufacturer or supplier, or transport or ship the unit later.
Checking the mains fuse
Before installing the equipment you need to make sure that the mains fuse fitted is of 
the correct type and rating for your unit.  To do this refer to “Replacing the mains fuse” 
on page 39.
Installation
This unit is designed for mounting in any 19” EIA standard rack.  Four rack-mount holes 
in the front panel are provided for rack mounting and are designed to fully support the 
weight of the unit in the rack.
Note: Avoid over-tightening the rack-mount screws, as this could damage the front 
panel.
The position of the unit will depend upon how it is to be used.  However, when 
positioning the unit, avoid placing it where the control knobs may be damaged by being 
accidentally knocked or snapped off.  Also, try to avoid placing the unit directly near or 
on any power distribution units or power amplifiers.
Quantity
Description
Part number
1
DN540 unit
Not applicable
1
DN540 Operator Manual (this document)
DOC02-DN540
1
Warranty  card
DOC04-WARRANTY
1
Mains  lead
PWR21-MAINSLEAD