Lincoln Electric SVM199-A Manual Do Utilizador

Página de 145
SWITCH BOARD AND FILTER CAPACITOR 
REMOVAL AND REPLACEMENT (continued)
REPLACEMENT PROCEDURE
1.  If the filter capacitor is to be replaced, careful-
ly  slide  the  new  capacitor  into  the  mounting
bracket.  Position the capacitor so the correct
polarity  terminal  is  lined  up  with  the  correct
hole on the switch board. 
2.  All  heat  sink  and  IGBT  mounting  surfaces
must be clean.
3.  Apply  a  thin  coat  of  thermal  compound
(Penetrox A13) 0.005 to 0.010 inches thick to
the  mating  surfaces.    Do  not  apply  around
mounting holes.
4. Apply  a  thin  coat  of  Penetrox  A13  to  the
capacitor  terminals.    Be  careful  not  to  apply
compound to screw threads or threaded area
of terminals.
5.  Mount  the  new  switch  board  and  tighten  the
four cap head screws in the following manner.
Tighten all until snug.
Tighten all from 24 to 28 in-lbs.
Tighten all from 40 to 48 in-lbs.
6.  Make sure the capacitor is positioned correctly.
Connect  leads  19C/D+  and  20C/D-  to  the  cor-
rect terminals.  Tighten to 55 in/lbs.
7.  Position and mount the two nylon screws, fiber
spacers,  and  washers.   Torque  from  4  to  8  in-
lbs.
8.  Connect leads 15/16 to the correct terminal.
9.  Connect leads 17/18 to the correct terminal.
10.  Install  the  mylar  insulating  shield  covering
leads 15/16.  Replace the cable tie.  
11.  Connect molex plug J40/J50 to the top of the
switch board.
12.  Using  the  5/16”  nut  driver,  install  the  plastic
high voltage protective shield.  
13.  Install  the  case  top  and  sides  using  the  3/8”
nut driver.
TROUBLESHOOTING AND REPAIR
F-83
F-83
INVERTEC® V450-PRO
PLUG J40/J50
          7/16” NUT
(Leads 13/14 or 17/18)
          7/16” NUT
(Leads 11/12 or 15/16)
              7/16” NUT
(Leads 19C/D+ and 20C/D-)
PLUG J40/J50
          7/16” NUT
(Leads 13/14 or 17/18)
          7/16” NUT
(Leads 11/12 or 15/16)
              7/16” NUT
(Leads 19C/D+ and 20C/D-)
FIGURE F.24 – SWITCH BOARD LEADS