Philips V24CT Manual Do Utilizador

Página de 392
Performance Assurance Checks
Maintenance   13-11
M
a
int
e
na
nc
e
  
Performance Assurance Checks 
The following performance assurance checks are designed to be 
completed to verify proper operation when: 
The monitor has been installed 
An assembly has been repaired 
To verify the operation any time the unit is suspect. 
The performance assurance checks fall into two parts:
1. Verification of overall operation by completing the Performance 
Assurance Test
2. Verification of plug-in module operation by completing the 
Functional Test procedures. 
You can perform any of the checks in any order you choose. They are 
broken up here for organizational sake.
Performanc
e Assurance 
Test
To verify your monitor works properly, perform the following 
performance assurance test:
1. Connect the power cord to the monitor and plug it in to an AC 
power source. 
2. Turn the monitor on by pressing the ON/OFF button. (The monitor 
should complete the start-up after a few moments.)
3. Observe that there is a screen display and no error codes. 
If any error codes are displayed, refer to the chapter 
“Troubleshooting Instruments” in the Service Guide.
If the screen comes up blank, check that the external power cable is 
plugged in. If the screen is still blank, contact your biomedical 
engineering department or the Philips representative.